免费无码国产V片在线观看_久久99精品久久久久久清纯_欧美丰满熟妇xxxx_特黄a级毛片免费视频

Your Position: Home > News > Company News

Power supply department careful arrangement A number of construction personnel at high temperature of capacity for the enterprise

2016/8/25??????view:

10 August 6, 2016 when 15 points, outdoor temperature 35 ℃, as the port of belt in jiangsu industry co., LTD., more than 10 power construction personnel are dressed in thick clothes, is to seize the time for the enterprise capacity of new electricity transformer and tension construction.


"That morning 7 didn't arrive, the construction personnel to the site to do a good job of preparation, this saves a lot of time for construction." The company scene Pan Yunming director told reporters. At the scene, a large crane slowly lifting the transformer and construction personnel quickly climbed up the pole beside, replacement into line cable work in good order. Planned to 17 to send the electricity in the day, but in order to complete the construction task ahead, to the customer on electricity, construction personnel to construction in the hot sun, 14 when they completed the site construction, to the customer in advance on the electricity.


With the expanding of gangda industrial synchronous belt market sales, jiangsu port with industry co., LTD. Of the original 100 kva transformer capacity has been unable to meet demand, be badly in need of a new capacity of 200 kva transformer. Taizhou power supply company, the capacity of the enterprise power application after they receive immediately to the enterprise to understand in detail the scheme of electricity capacity, and determine the enterprise increase a 200 kva transformer, one high and three low ark, change into the line cable and rheological measurement equipment, at the same time arranged plan blackouts, finalized in August 06 weekend rest time to add capacity construction, reduce the impact of power outages.